CAR PARK – Re-surfacing

The Car park re-surfacing will begin on Monday 27th July and it is anticipated will be completed by 4th September. During this time the car park will be CLOSED for parking.
Alternative parking is available on areas adjacent to the driving range .

It is imperative that ALL members adhere to the instructions and park using the designated areas whilst work is taking place ( please click here for attached plan ). Please read these instructions carefully;

2 disabled parking bays are available at the front of the clubhouse – ONLY for blue badge holders .
Access to the parking areas is ONLY via the gate on the B3046 which will be opened at 7.00am each day. DO NOT attempt to drive up past the 1st tee. This gate will be locked at approx. 7.00pm each evening. Cars should then exit past the driving range bays and down the Emergency Access path alongside the putting green and exit the car park.

NO PARKING is permissible on any of the block paved areas at the front of the car park or Stewards garage. This area must be kept clear for bar and catering deliveries.

NO PARKING is permissible on any of the block paved area in front of the Emergency Access path to the 1st tee. This will be used to exit the range parking when the entrance gate is closed in the evening.
An access path / route from the parking area back to the clubhouse will be kept open during the works.
Parking arrangements will be restricted so we ask all members to be understanding, walk to the club or car share where possible.